Quarterly Visual Assessment Monitoring Form – Pueblo, CO

"*" indicates required fields

Step 1 of 3

Complete One Form Per Outfall

MM slash DD slash YYYY
Inspected By:*
Discharge/Outfall Applicability*
Note: If a facility does not discharge or have designated outfalls, a stormwater monitoring inspection shall be conducted to verify the absence of discharge.

Assessment Instructions

Visual assessments shall be made of samples collected in a clean, clear glass or plastic container in a well-lit area within the first 30 minutes (or as soon thereafter as practical) of when the runoff begins discharging from the facility. All samples shall be collected from a storm event that produces measurable discharge and that occurs at least 72 hours from the previously measurable storm event. The 72-hour storm interval is waived when the preceding measurable storm did not yield a measurable discharge, or if the facility documents that less than a 72-hour interval is representative for local storm events during the sampling period. Samples shall be discarded following evaluation.

Visual Assessment Conditions*
Check all that apply
Complete only if applicable.